Project Description | Remove overhead electrical lines and replace them with underground lines.
Scope of Work | RGE was contracted to design and construct the removal and replacement of approximately 7,000 liner feet of above-ground high voltage (HV) power lines and place them underground. The project consisted of trenching and installing conduit, switches, manholes, HV wire and all associated electrical HV hardware as well as replacement of streetlights. The project included the demo of all above ground electrical components including wire, poles, lights and all associated electrical hardware.
Client: Luke Air Force Base,
Glendale, Arizona