Rock Gap Engineering, LLC. collaborated with Mass Group on the design-build project with Change Labs Inc. The project is located in Tuba City, AZ adjacent to the Tuba City Chapter House. The new 1,476 square foot wood framed building consists of a community work space, conference room, restroom, kitchenette, coffee studio and coffee bar, and wrapped around front patio. The building is the first Change Labs Entrepreneurship Hub for Change Labs and Rock Gap is pleased to be a part of a historic journey.
Client: Change Labs Inc.
Location: 230 Main Street, Tuba City, AZ 8645
Contract Value: $798,884.00